Viewing 15 posts - 16 through 30 (of 38 total)
  • Author
    Posts
  • #10142
    Shane Barker
    Member

    Yeah but the lunches come and go, the CNC is forever.

    Shane

    #10152
    Norm Walters
    Member

    You got me there Shane

    #10163
    Andy Graves
    Keymaster

    Thanks Al, I will do some comparison but that give me a great place to start.

    #10240
    Gordon Shell
    Member

    This may sound like another plug for EOS, but I did a time study to show the advantages of 3cm. The kitchen was 34.80 square feet with a set on splash, one field seam and an integral bowl. I have details to support this but don’t know how to attach them here.

    the results were

    1/2″ material = 11.78 minutes per square foot

    3cm material =7.90 minutes per square foot

    This study took place in a non-CNC shop with one man building the top.

    #10241
    Andy Graves
    Keymaster

    Gordon,

    When you add the additional cost of material and installation, what kind of savings are you seeing. I really like the idea of working with 3cm, I just want to make sure it is truely a money maker and not just another alternative with the same profit margins.

    Thanks for the info.

    #10244
    Gordon Shell
    Member

    Andy,

    Your material costs should actually decrease. The cost of EOS comes in less than most 1/2″ solid surfaces. Because EOS requires no substrate you will have 100% savings on plywood or MDF. The only solid surface adhesive that is is required would be for seams and bowls, so your adhesive use would decrease by 75-90%( look at all the squeeze-out adhesive on your shop floor when you do stacked edges). Edge rework, because of glue lines or ghost stripes due to particulate floating doesn’t exist with EOS, so consider that 100% savings on rework.

    CNC shops are seeing 60-75% savings in fab time and non-CNC shops are seeing 40-60% savings.

    I have done a material study to show the use and cost of all consumables that go into 1/2″ top compared to a 3cm top, sounds petty but I have a back ground in process and manufacturing engineering, every penny counts.

    Imagine the savings on little things like denatured alcohol (to clean each piece of stacked material), silicone(used to adhere substrate), if you are using less denatured alcohol then you are also using less paper towels or rags, both cost money somewhere. Because EOS doesn’t require seam plates we can count those pieces as material saved also. I can go on and on but I’m afraid I’ll sound to much like an infomercial.

    Thanks

    #10245
    Karl Crooks
    Member

    Gordan, do you have any studies that you can share? I’m sure all here would be very interested in them.

    #10246
    Gordon Shell
    Member

    I have a simple excel format study that I can show you, anyone interested can email me @ gordon@eos-surfaces.com and I can attach it to an email for your review.

    Working on a comparison against laminate tops now, imagine being able to capture that market with a competetivly priced Solid surface offering, its already being done in some areas.

    #10283
    Tim Tiessen
    Member

    Wouldn’t that drive down the sales of regular solid surface, if you could sell the 3 cm cheaper? Would doing cheaper work be better than doing profitable work? I can see it is going to have staying power, and the savings make sense. Just don’t want to get into cheaper jobs. Cheap jobs come from cheap people and cheap people can save even more money by not paying your bill.

    I’m still interesting in the stuff, send my name to one of your distributors. Do you have a sample program for showrooms? If I don’t show it, I can’t sell it.

    #10286
    Shane Barker
    Member

    I agree with Al,

    Why not offer a product that has added value to the customer
    but cost less to fabricate, and at the same time charge a premium because of
    the added value. Oh wait! We might actually make more profit…Oh my!

    I think taking the approach to compete with Laminate is a
    desperate attempt that will inevitably hurt the Solid Surface market. The 3cm
    products have an obvious added value that should carry a premium price or at
    least start out that way.

    Shane

    #10287

    When you run some 3CM jobs you can really see the difference. Its all the little things besides TIME that gshell is talking about that add up to alot of savings. Our shop can produce a 3CM kitchen ready to install much faster than our laminate shop can produce one. If you can profile on your CNC and do an undermount stainless steel, every part of the job can be cut and profiled without re-introducing, it can go directly into the finishing area. We figure between, templating, CAD time, and finishing, a standard 55 sq ft kitchen takes less than 4 man hours.

    John

    #10288
    Andy Graves
    Keymaster

    Keep in mind that you just said CNC when you were talking about producing 3cm. That is a huge investment. Sure you save on man hours but you are spending more for:

    • Tooling, machine payment
    • CNC operater salery, digitizer
    • CAD operator
    • Floor space for cnc
    • Electricity for cnc
    • Maintenance on cnc
    • Extra man power on installation.

    These cost must be factored in because the shop can not absorb such expensive cost. Something has to pay for them and if you are running 3cm, that is what pays for it.

    #10289
    Rob Parker
    Member

    Ok hers one for ya….how many of you actually fabricated an EOS job? Or even sanded it? Ran the seams.

    #10291
    Shane Barker
    Member

    Whats your point Rob

    Shane

    #10293
    Andy Graves
    Keymaster

    RobP wrote
    Ok hers one for ya….how many of you actually fabricated an EOS job? Or even sanded it? Ran the seams.

    Rob,

    I sense that you feel that I don’t like the 3cm idea. This is not the case at all. I believe that it is a great idea. I just want to completely understand what I am up against before diving in head first. I don’t think that a 5% saving is enough to justify having different methods of fabrication. It confuses the crap out of the sales staff, the fabricators and the installers when you have two completely different methods.

    I am only asking questions so I can better understand.

Viewing 15 posts - 16 through 30 (of 38 total)
  • You must be logged in to reply to this topic.